GECINA - REFERENCE DOCUMENT 2017
07
FROM CORPORATE RESPONSIBILITY TO SUSTAINABLE PERFORMANCE Priority 3: reduce environmental footprint by a resource-efficient and carbon-neutral real estate
Actions and results
7.5.2.2
Theme
Key actions
Progress and results
Building design and investments
7 projects under development designed with a ■ performance level below 70 kWhFE/sq.m/year 100% of projects in development commissioned ■ Implementation of CSR scoring for the asset in ■ question
Design of assets with a maximum average ■ threshold of 70 kWhFE/sq.m/year for the office property and low energy building (BBC) renovation for residential Systematic integration of commissioning ■ operations in commercial developments Analysis of the carbon footprint of acquisitions ■ which will not be rebuilt in the short term Deployment of a retro-commissioning approach ■ to monitor all devices and equipment and to ensure their optimal operation based on occupant needs (seasonal audits, adjustment of management tools and required repairs) Monitoring and management of consumption via ■ a remote metering system to ensure data feedback and define an alert system Implementation of contracts with an energy ■ performance clause for office buildings (incentive contracts with operators) Improvements to equipment performance and ■ structural work (offices and residential)
Building operation
24 buildings commissioned in 2016 showed a ■ reduction in consumption of 7.2% in 2017 (excluding specific uses of the tenants) 14 buildings commissioned in 2017 and 18 ■ buildings for which this program will be put in place in 2018 42 buildings connected to the Hypervision ® ■ system 44% of commercial surface areas have contracts ■ incorporating an incentive clause linked to the energy performance of the building 32 parking lots (of which 8 in 2017) moved to LED ■ lighting (cumulative gain: 662,153 kWhFE/yr) 13 buildings with insulated piping and ductwork ■ (cumulative gain: 67,386 kWhFE/yr) 16 buildings received reduced ventilation flows ■ (cumulative gain: 725,009 kWhFE/yr) 13 buildings with optimized setpoints (602,724 ■ kWhFE/year) 62% of residential surface areas arecovered by ■ an incentives contract linked to the energy performance of the building Identification of a partner to deploy soft incentive ■ solutions (nudges) to promote changes in tenant behavior and implementation study with a tenant
Implementation of contracts that include an ■ incentive clause for the residential portfolio when Gecina controls operations Raising tenant and occupant awareness about ■ reducing consumption
Specific tenant uses
Analysis of Performance
7.5.2.3
Energy performance of the property portfolio in operation and under development 7.5.2.3.1
BREAKDOWN OF TOTAL ENERGY CONSUMPTION BY ACTIVITY (AT CONSTANT CLIMATE, EXCLUDING SPECIFIC TENANT USES) Primary energy Final energy
26 %
39 %
Residential
Residential
Offices 61 %
Offices 74 %
246 GECINA - REFERENCE DOCUMENT 2017
www.gecina.fr
Made with FlippingBook Online newsletter