Annual Activity Report 2025

SUSTAINABILITY STATEMENT

Societal and environmental challenges at the heart of the strategy

4.1.5.5 Data point chaining and speci fi c information from Orano A sustainability sub-topic is “material” when the rating of an impact, risk, or opportunity exceeds the materiality threshold de fi ned by the group. A sustainability issue (and therefore the associated ESRS) is material when a sub-topic is material.

On the basis of the material IROs, Orano analyzed all the data points of the ESRS standard and excluded certain irrelevant requirements, non-mandatory requirements, etc ., from disclosure. This document covers around 800 data points, therefore 32 additional Orano entity-speci fi c metrics.

For each IRO and materiality sub-topic, the chaining exercise makes it possible to determine the Disclosure Requirement (DR) and Data Points (DP) to be included in the sustainability statement.

LIST OF DISCLOSURE REQUIREMENTS (DR)

Disclosure issues and requirements (DR)

Section

Orano - speci fi c data points

ESRS 2 BP-1 – General basis for the preparation of sustainability statements

4.1.1.1 4.1.1.2 4.1.2.1

BP-2 – Disclosure in relation to speci fi c circumstances

GOV-1 – The role of the administrative, management and supervisory bodies GOV-2 – Information provided to the Company’s administrative, management and supervisory bodies and sustainability matters addressed by these bodies GOV-3 – Integration of sustainability-related performance into incentive schemes

4.1.2.2

4.1.2.3 4.1.2.4

GOV-4 – Statement on due diligence

4

GOV-5 – Risk management and internal controls for the sustainability statement

4.1.2.5

SBM-1 – Strategy, business model and value chain SBM-2 – Interests and views of stakeholders

4.1.3 4.1.4

SBM-3 – Material Impacts, Risks and Opportunities and their interaction with strategy and business model IRO-1 – Description of the processes to identify and assess material Impacts, Risks and Opportunities IRO-2 – Disclosure requirements in ESRS covered by the undertaking’s sustainability statement Policies MDR-P – Policies adopted to manage material sustainability matters Actions MDR-A – Actions and resources in relation to material sustainability matters Metrics MDR-M – Indicators in relation to material sustainability matters 4.2, 4.3, 4.4 Targets MDR-T – Tracking effectiveness of policies and actions through targets 4.2, 4.3, 4.4 E1 – CLIMATE CHANGE ESRS 2 GOV-3 – Integration of sustainability-related performance in incentive schemes 4.2.1.1 E1-1 – Transition plan for climate change mitigation 4.2.1.4 ESRS 2 SBM-3 – Material Impacts, Risks and Opportunities and their interaction with strategy and business model 4.2.1.2 ESRS 2 IRO-1 – Description of the processes to identify and assess material climate-related Impacts, Risks and Opportunities 4.2.1.3 E1-2 – Policies related to climate change mitigation and adaptation 4.1.5.1 4.1.5.2 4.1.5.3 4.2, 4.3, 4.4 4.2, 4.3, 4.4

4.2.1.4 4.2.1.5

Share of industrial operations that have a climate change adaptation plan Share of major projects above 20 million euros carrying an eco-design approach (%)

4.2.1.4 4.2.1.5

E1-3 – Actions and resources in relation to climate change policies

139

Orano - Annual Activity Report 2025

Made with FlippingBook Annual report maker