Euronext - 2019 Universal Registration Document
Euronext, a sustainable exchange
Euronext’s Five ESG Impact Areas and the Sustainable Development Goals
Brussels Euronext Brussels moved its offices in May 2015. The Marquis building, where Euronext Brussels have now its premises, has BREEAM certification (sustainable building design and construction). Euronext accounts for 2.67% of overall gas, electricity and water consumption of the Marquis building (fixed percentage). This means the figures don’t represent the actual consumption of Euronext Brussels but just a pro-rata of the total consumption of the building. Porto Euronext concluded in 2017 the transfer of IT operations located in Belfast to Porto, to the same premises as Interbolsa, Euronext’s Portuguese Central Securities Depositary (“CSD”).
Dublin The Euronext Dublin office was redeveloped in 2019 allowing all Euronext staff to work in one central campus, combining the original Irish Stock Exchange Building with the Armoury of Bank of Ireland. In addition to increasing the capacity to host local forums and events, the new building will preserve all of the heritage, history and tradition of the original Irish Stock Exchange (conserving the original trading floor and Georgian architecture) whilst adding a new dimension with a modern way of working and new technology. The building has been designed to achieve “Leed Gold” status which means it will be among the most sustainable buildings in Ireland and will have sustainable practices such as reusing water for planting and irrigation. Space for more than 35 bikes as well as six showers to encourage team members to commute in a sustainable way will be added and everything that was taken out of the ground during construction will be either reused in the building’s construction, or recycled.
3
Consumption of Electricity, Water, Gas and Oil The 2019 results (compared to 2018 and 2017) of consumption of gas, water, electricity, and oil are the following:
GAS (M³)
Amsterdam Brussels
Dublin Lisbon & Porto
Paris*
Oslo London**
2019
118,302
5,525
5,318
55,155
N/A
N/A
N/A
2018
124,295
5,096
7,954
53,614
N/A
/
N/A
2017
123,010
6,636
8,314
42,541
N/A
/
N/A
* There is no use of gas in Paris offices. ** There are no individual gas meters to tenants floors in the Building in London, so no possibility of measuring the gas usage.
WATER (M³)
Amsterdam Brussels
Dublin Lisbon & Porto
Paris*
Oslo London**
2019
5,214***
325
N/A
1,765
3,387
1,973
N/A
2018
4,842
337
86
1,169
4,270
/
N/A
2017
4,943
469
301
2,125
2,925.8
/
N/A
* Frozen water in Paris offices (m³): 203,965 (2019) – 243,188 (2018) – 233,219 (2017). Cold water in production in Paris offices (m³): 713 (2019) – 860 (2018) – 829 (2017). ** There are no individual water meters to tenants floors in the Building in London, so no possibility of measuring the water usage. *** The slight increase of water consumption in Amsterdam is due to the fact that the building is completely full with Euronext employees but also with a lot of tenants. So there is no unoccupied office space left.
ELECTRICITY (KWH)
Amsterdam Brussels
Dublin Lisbon & Porto*
Paris
Oslo
London
2019
3,088,062
117,241
57,390
580,975
1,839,858
3,705,897
68,372
2018
3,330,030
129,465
64,386
451,105
1,881,761
/
518,938
2017
3,533,369
133,277
29,570
465,133
1,915,119
/
433,044
* The increase in consumptions of water and electricity in Portugal are related to the additional floor (8 th ) Euronext is occupying since the beginning of 2019.
79
2019 UNIVERSAL REGISTRATION DOCUMENT
Made with FlippingBook - Online Brochure Maker