The main investments in 2019 are as follows: ◆ for the Paris-Charles de Gaulle Airport:
◆ for Paris-Orly Airport: ◆ the renovation of runway 3, ◆ the end of construction work on the junction between Orly 2 and Orly 4 (formerly the West terminal and South terminal), ◆ the regulatory compliance of Orly 4 (formerly Orly South) East baggage sorting, ◆ the works in preparation for the construction of the future Grand Paris station, ◆ the resumption of the waterproofing and reinforcement of bridge n°2 under runway 3, ◆ the creation of a new shopping area in the international departure zone at Orly 4 (formerly Orly Sud), ◆ the creation of a pedestrian link between Orly 3 (junction building) and Orly 4 (formerly Orly Sud), ◆ the redevelopment of air traffic lanes to the south of Orly 4 (formerly Orly Sud), ◆ the restructuring of Hall E of Orly 4 (formerly Hall B of Orly Sud), ◆ the reconfiguration of security controls for international departures from Orly 4 (formerly Orly Sud) and the restructuring of the associated shopping area; ◆ investments at the Paris-Le Bourget airport, mainly related to the construction of the AFMAE apprentice training center; ◆ on Queen Alia Airport, the investments are mainly ported on the extension of the luggage sorter; ◆ in 2019, Aéroports de Paris also made significant investments for its support functions and for projects common to the IT platforms.
◆ the renovation of terminal 2B and its junction with terminal 2D, ◆ the construction of the international satellite junction of Terminal 1, ◆ the purchase of standard 3 hold baggage screening equipment related to European regulations (CDG), ◆ the construction of a connecting baggage sorter under Hall M of CDG 2 (TBS4), ◆ the works of road accesses to CDG, ◆ the overhaul of the atmosphere in Hall L of Terminal 2E, ◆ the preparatory works for the construction of the CDG Express, ◆ the extension of the Delta and Quebec City lanes north of Terminal 1, ◆ study costs related to the construction project for Terminal 4, ◆ the overhaul of the shops in Hall L of Terminal 2E, ◆ improved orientation on the passenger route, ◆ the installation of guidance charts and information screens (“timers”) for pilots and ramp attendants, ◆ the extension of the India areas at CDG, ◆ the creation of a single Air France lounge in terminal 2F, ◆ the renovation of the AB car park, ◆ the works on the upper floor of the PR car park, ◆ the overhaul of the screening stations in terminal 2E, ◆ the reconfiguration of the TME baggage sorter in terminal 2E;
/ / DIVIDENDS RECEIVED
2019
2018 1
(in millions of euros)
TAV Antalya
119
-
Schiphol Group
9 8
12 12
ATU TGS
16
9 3
RELAY@ADP
-
SCI Roissy Sogaris
1
-
Other TOTAL
20
3
173
39
1 Restated figures as described in notes 2.2 & 12.
254
AÉROPORTS DE PARIS ® UNIVERSAL REGISTRATION DOCUMENT 2019
Made with FlippingBook Publishing Software