processes (single-security checkpoints, baggage delivery). This project will adapt the 2BD complex to the expected increase in international medium- and long-haul traffic by increasing capacity; ◆ the linking of international satellites in Terminal 1, also aimed at sharing the security check and screening functions and boarding lounges, and at increasing the retail and service spaces so that an offering can be introduced that is tailored to international customers. In addition, there are plans to devote significant resources to the functional robustness of the Paris-Charles de Gaulle airport, and to targeted operations for customer satisfaction and sustainable development. In addition to infrastructure projects, it is the entire policy of optimising assignments of airlines to Paris-Charles de Gaulle that has allowed the airport to respond to the needs of different types of traffic (point-to-point passenger traffic, connecting passenger traffic, development of freight activity benefiting from medium and long-haul traffic to and from Paris- Charles de Gaulle).

The preliminary draft of the file is in progress and preparatory work could begin in 2019. There are around 28,600 parking spaces at Paris-Charles de Gaulle airport, 18,000 of which are in adjacent car parks (in direct contact with the terminals). Investment programme Aéroports de Paris is constantly improving the quality of its aviation infrastructure. In addition, Aéroports de Paris has launched an ambitious investment programme in order to guarantee the quality of its aviation infrastructure, and to increase the handling capacity of its terminals. The main investments at Paris-Charles de Gaulle airport in 2017 are described inchapter 5 1 . The 2016-2020 projected investment programme for the regulated scope is outlined in chapter 5 2 . It includes: ◆ refurbishing terminals 2B and 2D and building a link between the two terminals, creating extra needed floor area in 2B and pooling passenger

The main projects included in the proposed 2016-2020 investment programme for the regulated scope are shown in the map, below:

06

3

2

1

4

5

11

12

10

8

7

3

9

7

6

1.Roadwidening to three lanes fromParis 2.Connectionof the international satellitesof terminal 1 3.Securingofparallelnorthern runways+ renovationof runways2and3 4.Deploymentofadditional trains (CDGVal) 5.Extensionofparkingareas forwide-bodiedaircraft

6.Rainwatermasterplan 7. TDS3-S4baggage sorters 8.Creationofaircraft standsandadaptationofCDG2E 9. Tunnelunder runway4 for theCDGExpress 10.Renovationof TBC1and TBC2baggage sorters 11.Renovationof2BandBD junction 12.RenovationofPAB carpark.

1 Please refer to the paragraph in Chapter 5 entitled “Investments made by the Group over the last three financial years”. 2 Please refer to the paragraph in Chapter 5 entitled “Planned investment programme for Paris-Charles de Gaulle airport”.