technicolor - 2018 Registration document

ADDITIONAL INFORMATION

PROPERTY, PLANT AND EQUIPMENT

Operating Facilities

Primary Activity

Type of Action

Singapore CH (Singapore)

Office/Lab

Closure Closure Closure

Tokyo TECH (Japan)

Office

Vancouver PS (Canada – 916 Davie)

Storage

100 W. Alameda and 1109 Flower St. – Lease to be surrendered 28-Feb-2019. (1) Issy-les-Moulineaux – Lease to be surrendered 14-Jan-2019. (2)

In 2018, Technicolor has added the following sites (in some cases, relocating from other locations as indicated by the footnotes), increasing the total footprint: New Sites Primary Activity Total Square feet LaVergne HES (TN, United States) Warehouse/Distribution 100,799 Bangalore PS (India) Production 92,699 Paris PS (France – Rue du Renard) (1) Production 89,340 Montreal PS (Canada) (2) Production 83,279 Mexicali HES (Maran 5 – Mexico) Warehouse 50,000 Adelaide/Kidman Park PS (Temp Space – Australia) Production 6,900 Culver City PS (CA, United States) Production 8,551 Shenzhen CH (China) (3) Office/Lab 5,672 Guadalajara CH (Mexico) Office 2,992 Burnaby PS (Canada) (4) Warehouse 2,517 Mexico City CH (Mexico) (5) Office 1786 Munich HES (Germany) (6) Office 745 Milan CH (Italy) (7) Office 624 Princeton CORP (NJ, United States) (8) Office 350 Replaced Issy-les-Moulineaux (195,428 SF) (1) Includes 3 phases of space at 740 St. Maurice (46,566 SF); Phase 1 – 18,845 SF delivered in 2018; Phases 2 and 3 to be delivered in 2019 & 2020. (2)

Replaced Shenzhen location (3,112 SF). (3) Replaced Mexico City location (6,459 SF). (4) Replaced Vancouver location (1,727 SF). (5) Replaced Munich location (2,5019 SF). (6) Replaced Milan location (2,906 SF). (7) Replaced Princeton location (16,933 SF). (8)

In 2018, Technicolor has experienced continued growth in the Production Services business, expanding the already existing locations below and increasing the total footprint.

Expanded Sites

Primary Activity

Canada-Montreal-MPC India-Bangalore-MPC

Production Production

Technicolor’s objective is to optimize the location and the organization of its operations, to reduce its production costs and working capital requirements, maximize the quality, flexibility and responsiveness of its products and services, while minimizing negative impacts that could affect the environment or the health and safety of its employees and contractors.

End 2018, the global real estate footprint is 12.09 million square feet compared to 12.2 million square feet end 2017, i.e. decrease of 0.70%. This decrease reflects the closure and downsize of multiple sites. The Group operates various manufacturing, production, distribution facilities in order to deliver products and services to customers. In addition, Technicolor relies on external partners for manufacturing some of its finished products, particularly for Connected Home.

7

293

TECHNICOLOR REGISTRATION DOCUMENT 2018

Made with FlippingBook - Online Brochure Maker