SOLOCAL_Registration Document_2017

CORPORATE SOCIAL RESPONSIBILITY 3.7 Appendix 1 – Note on methodology

INDICATORS NOT REPORTED

Based on its obligations to report on the 43 CSR subjects according and its stakes. These indicators cover the three sections of to Article 225 of the Grenelle 2 Act, SoLocal Group has selected the Article 225 of the Grenelle 2 Act: Environment, Social and Societal. indicators considered the most significant in view of its business

1

INDEPENDENT VERIFICATION

An independent third party reviews and certifies the presence and under which the independent third party carries out its mission), truthfulness of the CSR information published in the Reference the AFNOR principles (FD X30-024) and the ISO 17020 standard. Document in accordance with the requirements of the Grenelle 2 The independent third party’s report on the consolidated social, Act. This work is carried out in accordance with the regulations environmental and societal information published is presented in (Decree dated 13 May 2013 determining the terms and conditions this Reference Document.

2

3

MAIN METHODOLOGICAL DETAILS

The energy consumption resulting from these works has not been taken into account in the consolidated data in this Reference Document. This consumption is as follows:

4

METHODOLOGICAL DETAILS FOR 2016 INDICATORS

1.

electricity: 290 MWh; l urban heating – heat: 190 MWh; l urban heating – cold: 46 MWh. l

Management of the indicators as part of moving the head office to Boulogne-Billancourt in the “Citylights” building SoLocal Group’s head office moved from Sèvres to Boulogne-Billancourt, in the “Citylights” building in May 2016. The technical rooms were dismantled from the end of 2015 until the relocation of the head office. The servers in these rooms have been grouped together in Rennes’ internal and external datacentres or at external service providers.

5

BUREAUX PJSA – ISSY-LES-MOULINEAUX SoLocal’s employees left the premises of PJSA in Issy-les-Moulineaux on 25 May 2016. SoLocal nevertheless remained a tenant of the site until the end of 2016. Work is taking place during this period in the building. The energy consumption resulting from these works has not been taken into account in the consolidated data in this Reference Document. This consumption is as follows: Electricity: 313 MWh. l

6

7

Energy consumption during periods of construction

CITYLIGHTS

8

Between January and April 2016 development work took place in the “Citylights” building before the arrival of SoLocal’s employees.

81

2017 Registration Document SOLOCAL

Made with FlippingBook - Online catalogs