ORANO // Annual Activity Report 2024

4

SUSTAINABILITY STATEMENT Environmental information

Analysis results Revenue Orano identi fi ed three eligible activities within the meaning of the taxonomy: The eligible turnover ratio is 0.9%. The aligned turnover ratio is 0.2%.

Eligible turnover (in millions of euros)

Aligned turnover (in millions of euros)

Taxonomy activities

Environmental objective Rationale for alignment

5.1. Construction, extension and operation of water collection, treatment and supply systems

Climate change mitigation Climate change mitigation Climate change mitigation

Energy consumption criterion not met

33.5

0.0

GHG emissions criterion met GHG emissions criterion not met

6.2. Freight rail transport

13.2

13.2

6.6. Freight transport services by road

7.2

0.0

TOTAL TURNOVER

53.9

13.2

TOTAL GROUP TURNOVER

5,874.0

5,874.0

Ratio

0.9%

0.2%

Capital Expenditure (CapEx) Orano analyzed the eligibility and alignment of its capital expenditure (Capex), focusing on eligible activities. The eligible capital expenditure ratio is equal to 10.4%. The aligned capital expenditure ratio is equal to 3.1%.

2024

Examples of Orano activities or projects

Eligible CapEx (in millions of euros)

Aligned CapEx (in millions of euros)

Taxonomy activities

Rationale for alignment

CLIMATE CHANGE MITIGATION

Criteria not met in particular for industrial buildings

7.7. Acquisition and ownership of buildings Construction of industrial and tertiary buildings

70.3

4.7

Investments related to the mitigation plan and energy performance Electri fi cation of the service vehicle fleet Development of a new activity of battery recycling Renovation of tertiary and industrial buildings Operation of a seawater desalination plant in Namibia

7.3. Installation, maintenance and repair of energy ef fi ciency equipment

Criteria met

11.5

11.5

Low-emission vehicles compliant with current European regulations

6.5. Transport by motorbikes, passenger cars and light commercial vehicles

8.2

2.4

3.4. Manufacture (and recycling) of batteries

Criteria met

4.3

4.3

7.2. Renovation of existing buildings

Criteria not met

4.0

2.2

5.1. Construction, extension and operation of water collection, treatment and supply systems 7.4. Installation, maintenance and repair of charging stations for electric vehicles in buildings (and parking spaces attached to buildings) 5.2. Renewal of water collection, treatment and supply systems

Energy consumption criterion not met.

1.6

0.0

Support for the electri fi cation of the service vehicle fleet Renewal of water networks

No substantive criteria or speci fi c DNSH

1.0

1.0

Criteria not met

0.7

0.0

162

Orano - Annual Activity Report 2024

Made with FlippingBook - professional solution for displaying marketing and sales documents online