NATIXIS // 2021 Universal Registration Document

7 ACCOUNTABILITY REPORT ENVIRONMENTAL AND SOCIAL RESPONSIBILITY 2021 Business line contributions to green and sustainable growth

GWF breakdown on the temperature calculation scope of Corporate & Investment Banking exposures as of 12/31/2021 (i.e. €114 billion of exposures, 86% of which are colored)

33%

44%

It should be noted that although the brown portion reached 44%, the dark brown portion, which represents the gross exposures to the most emissivecounterparties,was reducedby 12.1% in 2020 to 6.4% in 2021. This methodology is scalable, and may include the criteria of the European classification – or taxonomy – as the European Commission’s “Sustainable Finance Platform” progresses.

23%

Gross exposures excluding financials, Global Markets and sovereigns (CIB scope)

Financing and investment in renewable energy

7.2.2.2

In 2020, new renewable electricity capacity installations reached nearly 280 GW worldwide, i.e. 45% more than in 2019 according to the IEA. In particular, nearly 135 GW of new solar photovoltaic capacitieswere deployed in 2020. The wind energy sector (+114 GW in 2020) saw a virtual doubling of its annual capacity. The exceptional level of new renewable electricity capacity installations is expected to be maintained, with 270 GW becoming operational in 2021 and 280 GW in 2022. In 2021, Natixis once again positioned itself as a leading player in renewable energy financing, particularly in Europe and America. Natixis ranks 3rd world rank of MLA banks in renewable energy project financing (1) : Renewable energy financing In 2021, the Natixis CIB’s infrastructure financing teams arranged 26 new deals in 2021 totaling €2.21 billion, representing an installed capacity of 6,830 MW; 7 onshore wind farms with a total capacity of 2,555 MW; V 18 PV and concentrated solar power projects with a capacity of V 4,151 MW; 1 hydroelectric facility with a capacity of 125 MW. V Renewable energy accounted for more than 95% of total new financing granted by CIB in the electricity production sector in 2021.

Total installed capacity of renewable energy projects financed by Natixis per year

7,832

(in MW)

7,152

6,830

6,510

4,855

2,846

2021

2016 2017

2018 2019 2020

Amount arranged by Natixis for renewable energy projects per year

(in €m)

2,214

2,089

1,786

1,500

1,313

1,015

2021

2016 2017

2018 2019 2020

Source: IJGlobal’s Infrastructure and project finance league table report 2021. (1)

476

NATIXIS UNIVERSAL REGISTRATION DOCUMENT 2021

Made with FlippingBook Annual report maker