GECINA - REFERENCE DOCUMENT 2017
RISKS Risks
Results (weighted efficiency rate) as a %
Areas
Control mechanism
Lev. Risk
2016
Variation in efficiency
2017
FIRE
+
98.7
The efficiency recorded improved in 2017. The Group uses renovation work on all or a portion of a building to improve fire safety, beyond the regulations if necessary, and informs the occupants concerned of the measures taken. As a reminder, since 2015, the Group has taken over the supply and installation of autonomous smoke alarms (DAAF) across its residential property portfolio.
Regulations risks prevention are thorough and often complex. Indeed, premises governed by the French Labor Code, ICPEs (regulated facilities for environmental protection), public access facilities (ERPs), high-rise buildings (IGHs), and residential premises are all governed by different regulatory texts. They mainly seek to guarantee the protection of people. Furthermore, insurers recommend specific measures to protect property. on fire Gecina is subject to strict regulations concerning technical equipment on which, for the most part, the safety and quality of service provided to occupants depends (fire equipment, electricity, lightning rods, boiler rooms, CMV gas, lifelines, etc.).
Gecina seeks to provide the occupants of its property assets with a good level of fire safety and eliminate the faults that could be the source of danger for people and properties. Gecina implements the vulnerability reduction measures identified by experts following the audit of the sites.
100
TECHNICAL COMPONENTS
100
100
The weighted efficiency rate is stable. Technical equipment is maintained by selected, qualified companies under formal framework contracts and particularly studied in the interest of the Group.
The extent of Gecina’s obligation means that all of its property assets are appropriately equipped with safety devices and technical systems that function properly. The inspections, tests and technical examinations provide an opportunity to identify the installations in order to detect any possible defects that could endanger people and property, and to rapidly implement the recommendations made during these operations.