EDF / 2019 Universal registration document
3. Non-financial performance Appendices, concordance tables and report from Statutory Auditors
Societal key performance indicators and outcomes
Level of assurance
Number of customer visits on digital consumption monitoring platforms (millions)
Limited Limited Limited Limited Limited Limited Limited Limited
Number of smart meters installed (millions)
Nuclear safety: Number of significant level 2 events on the INES scale
Number of energy support
Percentage of projects on which there was consultation in accordance with the Equator Principles Proportion of executives who have completed the anti-corruption training program (%) Number of alerts recorded in the Group’s whistleblowing system (excluding RTE and Enedis)
Annual rate of procurement from SMEs (%)
Appendix 2: List the contributing entities in the report
Sample of selected entities
Pôle Compétences santé au travail de Mulhouse Division Production nucléaire – Unité d’ingénierie d’exploitation Division Production nucléaire – Unité technique opérationnelle Division Ingénierie nucléaire – Direction de projets déconstruction déchets
Within EDF
Enedis head office Direction régionale Languedoc Roussillon (RH) Fuel assembly manufactoring of Jarrie Fuel assembly manufactoring of Lingen
Within Enedis
Within Framatome
Within Insular Electrical Production
Site of Jarry
Nuclear power plant of West Burton A Nuclear power plant of Hartlepool EDF Energy Crawley Headquarter (RH)
Within EDF Energy
EDF Renouvelables France EDF Renouvelables Canada
Within EDF Renewables
Within Edison
Edison Group
Direction Régionale Méditerranée Direction Régionale Nord Dalkia Smart Building Wastenergy
Within Dalkia
Within Norte Fluminense
Site of Macao
203
EDF | Universal registration document 2019
Made with FlippingBook - Online magazine maker