Areva - Reference Document 2016

PROPERTY , PLANT AND EQUIPMENT

08

PRINCIPAL SITES OF THE GROUP

93 93 96 98 98

ENVIRONMENTAL ISSUES THAT MAY INFLUENCE THE ISSUER’S USE OF PROPERTY, PLANT AND EQUIPMENT

8.1.

8.2.

8.1.1. NewCo’s operations 8.1.2. AREVA NP’s operations

99

8.1.3. Other operations

8.1.4. Scheduled investments

8.1.

PRINCIPAL SITES OF THE GROUP

Pursuant to Appendix 1, point 8 of European Commission Regulation no. 809/2004 of April 29, 2004 and recommendation 146 of the European Securities andMarkets Authority (ESMA), information is provided hereunder on the real estate properties and rentals used by the group in connection with its operations.

The group’s principal worldwide plant sites at December 31, 2016 are listed below. The primary criterion for listing sites is the size of the operation conducted there. It should be noted that several different operations are performed at some of these sites.

8.1.1. NEWCO’S OPERATIONS

MINING

8.1.1.1.

Existence of encumbrances on the real estate Surface area

Location

Type of asset

Lease/full ownership

Products manufactured

146.6 ha Building: 347,907 m 2

Arlit Niger

Offices + production and storage facilities

Long-term concession/ Full ownership Long-term concession/ Full ownership

Uranium concentrates

No

Imouraren Niger Trekkopje Namibia Trekkopje Namibia McClean Canada

Mining site

No

20,000 ha

Under development

Mining site

Full ownership

No

37,367 ha

Care and maintenance

Land: 20 ha Building: 12,948 m 2 Seawater desalination

Desalination plant

Full ownership

No

Long-term concession/ Full ownership

Mill + base camp Offices + production and storage facilities Offices + production and storage facilities Offices + production and storage facilities

No

4,600 ha

Uranium concentrates

Bessines/Gartempe (France)

Research laboratory and U3O8 storage

389.1 ha Building: 50,586 m 2

Full ownership

No

Muyunkum Kazakhstan Tortkuduk Kazakhstan

Long-term concession/ Full ownership Long-term concession/ Full ownership

No

72.2 ha

Eluates

Eluates + uranium concentrates (U 3 O 8 )

103.4 ha Building: 37,701 m 2

No

93

2016 AREVA REFERENCE DOCUMENT