Areva - Reference Document 2016
06
BUSINESS OVERVIEW
6.3 Overview and strategy of the group
The bioenergy operations, which are to be discontinued, do not meet the criteria set by the accounting standards for classification in discontinued operations because of two ongoing contracts. Details on the adoption of IFRS 5 are given in Section 9.2. Situation and activities of the company and its subsidiaries by business segment during the yea r and in note 3 of the Notes to the consolidated financial statements.
At December 31, 2016, the following operations meet the criteria in IFRS 5 for classification as “operations sold, discontinued or held for sale” and no longer contribute to the key financial indicators reported by AREVA:
p New AREVA Holding, temporarily called “NewCo”;
p AREVA NP (excluding the OL3 contract), corresponding to the “New NP” consolidation scope;
p Nuclear Measurements (Canberra);
p Propulsion and Research Reactors (AREVA TA);
Solar Energy;
p
Wind Energy (Adwen).
p
THE GROUP’S BUSINESSES The group’s operations in the nuclear power sector concern the following segments:
Post operation
Fabrication de MOX Fabrication de combustible UO 2 MOX fabrication UO 2 fuel fa rication
Production d’énergie / Exploitation / Services Energy production / O eration /
Démantèlement des sites nucléaires Nuclear site dismantling
Gestion du combustible usé Used fuel management
Extraction d’uranium Uranium mining
Chimie de l’uranium Uranium chem stry
Enrichissement Enrichment
Exploration, extraction and processing of natural uranium
Used fuel treatment
Natural uranium conversion into uranium hexafluoride (UF 6 )
UF 6 enrichment by ultra centrifugation
Fuel assembly design and fabrication
Reactor design and construction (NSSS, nuclear island) Equipment manufacturing Safety improve- ment, maintenance, control and upgrades of nuclear islands Production and installation of instrumentation and control systems
of sites and facilities at the end of operations Operating services
Nuclear materials shipping (uranium, fuel, used fuel, waste) Storage services and solutions Cask design and manufacturing Logistics services
AREVA Projects
Engineering support to the operator Full-scope engineering, procurement, construction and management (EPCM)
NewCo consolidation scope
AREVA NP consolidation scope
Fuel Installed Base Components
Mining Front End Recycling Dismantling & Services Logistics AREVA Projects
Large Projects (excluding OL3 project) Technical & Engineering Department Instrumentation & Control
Source:AREVA.
55
2016 AREVA REFERENCE DOCUMENT
Made with FlippingBook