Aéroports de Paris projected investment programme within the regulated scope between 2016 and 2020 The projected investment programme within the regulated scope breaks down as follows:

Actual 2016 (in euros 2016) Actual 2017

Projected 2018

Projected 2019

Projected 2020

Total 2016-2020

Maintenance

196

186

241

238

143

1,003

Paris-Charles de Gaulle - Renovation of terminal 2B Paris-Charles de Gaulle - Renovation of terminal 2D Paris-Charles de Gaulle - Current Investments

12

28

32

36

16

123

-

-

-

-

3

3

121 42

92 40

95 89

88

75

471 312

Paris-Orly - Current Investments

100

41

Paris-Le Bourget - Current Investments Aeronautical real estate - Current Investments

1

2 4

3 6

8

2

15 16 61

6

-

-

Computer networks and systems Compliance with regulations Regulatory runway investments

14

19

15 17

6

6 7 4

53 38

38

24

139

19 15

8 5 4

21

91

Rainwater

11 3

-

-

32

05

Other regulatory compliance investments Optimisation of capacities and One Roof initiative Paris-Orly - Connecting of the South and West terminals Paris-Charles de Gaulle - Connecting of the 2B and 2D terminals Paris-Charles de Gaulle - Connecting of terminal 1 satellites

4

2

3

16

117

145

163

154

113

692

101

96

95

43

11

346

2

5

27

51

24

109

4 4 7

4

25

43

36

112 48 59

Airport infrastructures Other terminal projects

16

3

3 8 5

21

24

13

8

Terminal 4 preparatory work

-

-

-

12

17

Improving access

20

27

44

40

28

159

Paris-Charles de Gaulle - CDG Val

-

-

-

-

11

11

Paris-Charles de Gaulle - West access and secondary network

5

6 7

6

9

- -

26

Relocation of taxi operating base

-

1

-

8

Paris-Orly - Projects linked to the building of the future Grand Paris station

9 6

7 3

8

15

12

51

Other miscellaneous projects

18

9

-

37

Connecting platform competitiveness and other processes

105

98

150

156

129

639

Terminals

15

10

20

22

11

79

Paris-Charles de Gaulle - Aeronautical aprons and taxiways

4

6

28 24 59

64

36 27 38

137 105 234

Operational reliability

19

24 46

11

Luggage sorters Improving flows

55

37

3 9

2 11

8

7

4

23

IT projects

12

16

12

61

Service quality and sustainable development Aeronautical real estate development

28

37

70

39 22

25 26

199

17

12

16

93

Functional departments

1

1

-

-

-

2

Provisions for study expenses for ERA 2021-2025 operations

-

-

-

4

14

18

GRAND TOTAL

538

545

700

676

485

2,945

35

AÉROPORTS DE PARIS  REGISTRATION DOCUMENT 2017