Aéroports de Paris projected investment programme within the regulated scope between 2016 and 2020 The projected investment programme within the regulated scope breaks down as follows:
Actual 2016 (in euros 2016) Actual 2017
Projected 2018
Projected 2019
Projected 2020
Total 2016-2020
Maintenance
196
186
241
238
143
1,003
Paris-Charles de Gaulle - Renovation of terminal 2B Paris-Charles de Gaulle - Renovation of terminal 2D Paris-Charles de Gaulle - Current Investments
12
28
32
36
16
123
-
-
-
-
3
3
121 42
92 40
95 89
88
75
471 312
Paris-Orly - Current Investments
100
41
Paris-Le Bourget - Current Investments Aeronautical real estate - Current Investments
1
2 4
3 6
8
2
15 16 61
6
-
-
Computer networks and systems Compliance with regulations Regulatory runway investments
14
19
15 17
6
6 7 4
53 38
38
24
139
19 15
8 5 4
21
91
Rainwater
11 3
-
-
32
05
Other regulatory compliance investments Optimisation of capacities and One Roof initiative Paris-Orly - Connecting of the South and West terminals Paris-Charles de Gaulle - Connecting of the 2B and 2D terminals Paris-Charles de Gaulle - Connecting of terminal 1 satellites
4
2
3
16
117
145
163
154
113
692
101
96
95
43
11
346
2
5
27
51
24
109
4 4 7
4
25
43
36
112 48 59
Airport infrastructures Other terminal projects
16
3
3 8 5
21
24
13
8
Terminal 4 preparatory work
-
-
-
12
17
Improving access
20
27
44
40
28
159
Paris-Charles de Gaulle - CDG Val
-
-
-
-
11
11
Paris-Charles de Gaulle - West access and secondary network
5
6 7
6
9
- -
26
Relocation of taxi operating base
-
1
-
8
Paris-Orly - Projects linked to the building of the future Grand Paris station
9 6
7 3
8
15
12
51
Other miscellaneous projects
18
9
-
37
Connecting platform competitiveness and other processes
105
98
150
156
129
639
Terminals
15
10
20
22
11
79
Paris-Charles de Gaulle - Aeronautical aprons and taxiways
4
6
28 24 59
64
36 27 38
137 105 234
Operational reliability
19
24 46
11
Luggage sorters Improving flows
55
37
3 9
2 11
8
7
4
23
IT projects
12
16
12
61
Service quality and sustainable development Aeronautical real estate development
28
37
70
39 22
25 26
199
17
12
16
93
Functional departments
1
1
-
-
-
2
Provisions for study expenses for ERA 2021-2025 operations
-
-
-
4
14
18
GRAND TOTAL
538
545
700
676
485
2,945
35
AÉROPORTS DE PARIS REGISTRATION DOCUMENT 2017